{"ok":true,"trend":{"id":913010,"platform":"google","region":"US","key":"seabed","title":"seabed","url":"https://trends.google.com/trending?geo=US&q=seabed","first_seen":"2026-10-03T22:50:50.412227Z","last_seen":"2026-10-03T22:50:50.412227Z","last_rank":4,"peak_rank":4,"last_volume":500,"peak_volume":500,"seen_count":1,"score":0.629609375,"category_hint":null,"section":null,"category":null,"summary":"Crews have finished installing the last of one hundred offshore wind turbines about 121 miles off the English coast. The project sits on a stretch of North Sea seabed that was once dry land crossed by Stone Age hunters. The completion marks a major milestone for offshore wind energy in the region.","why":"The completion of a large offshore wind farm and the striking archaeological detail about the seabed are drawing attention.","tone":"positive","entities":["North Sea","England","North Sea wind farm"],"summarized_at":"2026-10-03T22:51:12.143767Z","meta":{"lang":"en","picture":"https://encrypted-tbn0.gstatic.com/images?q=tbn:ANd9GcTcKEShouI8y_fPuvz4pX9p8JgCCuqb-1ABnp_LMON23aqsM6BMG3Lj6TcEUnc","traffic":"500+","published":"Sat, 3 Oct 2026 15:30:00 -0700","picture_source":"Energies Media"},"nw":null,"promo":null,"kind":null,"importance":null,"hidden":false,"hide_reason":null,"judged_at":null,"title_en":"Final turbines installed on North Sea seabed off English coast","timeline":[{"captured_at":"2026-10-03T22:50:50.412227Z","rank":4,"volume":500}],"posts":[{"platform":"google","url":"https://www.ecoportal.net/uk/crews-finished-setting-last-hundred-turbines/3690/","author":"EcoPortal.net","title":"Crews finished setting the last of a hundred turbines 121 miles off the English coast, on a stretch of North Sea seabed that Stone Age hunters once crossed on foot as dry land","snippet":null,"posted_at":null,"likes":null}],"elsewhere":[{"id":956115,"platform":"google","region":"GB","title":"seabed","last_rank":7,"last_seen":"2026-10-04T07:50:48.285206Z","summary":"MacArtney's subsea solution is being used to guide massive tunnel elements into position on the seabed for the Fehmarnbelt tunnel, the major fixed link being built between Denmark and Germany. The project, one of Europe's largest infrastructure undertakings, involves sinking prefabricated elements to the seafloor with high precision, drawing attention to the underwater engineering behind it."}],"window":"7d"}}