{"ok":true,"trend":{"id":150839,"platform":"mastodon","region":"global","key":"singapore changed its rule for electricity imports: 2024: 75% load factor in every quarter 2025: 60% over the year per 1","title":"Singapore changed its rule for electricity imports: 2024: 75% load factor in every quarter 2025: 60% over the year Per 1","url":"https://mastodon.social/@paulmuenzner/117344659118284497","first_seen":"2026-09-27T20:47:42.678235Z","last_seen":"2026-09-28T07:43:42.909531Z","last_rank":6,"peak_rank":5,"last_volume":4,"peak_volume":4,"seen_count":9,"score":75.46,"category_hint":"energy","section":"environment","category":"energy","summary":"Singapore has changed its rule for electricity imports. Previously, imported capacity had to achieve a 75% load factor in every quarter under 2024 rules; the 2025 rule instead requires a 60% load factor averaged over the year. Per 1,000 MW of import capacity, that means up to 5.256 TWh a year instead of 6.570 TWh, about 20% less. Whether the change applies to earlier approvals has not been made public.","why":"The relaxed requirement cuts expected annual import volumes by roughly 20%, which matters for regional power exporters and Singapore's energy supply planning.","tone":"neutral","entities":["Singapore"],"summarized_at":"2026-09-28T08:51:25.761439Z","meta":{"tag":"energy","via":"scan","kind":"status","lang":"en","generic":0.06,"instance":"mastodon.social","tag_uses":42},"nw":0.48,"promo":0.03,"kind":"news_event","importance":1.41,"hidden":false,"hide_reason":null,"judged_at":"2026-09-27T20:47:42.964005Z","title_en":"Singapore relaxes electricity import load factor rule","section_name":"Environment","category_name":"Energy","timeline":[{"captured_at":"2026-09-27T20:47:42.678235Z","rank":6,"volume":4},{"captured_at":"2026-09-27T22:09:43.255299Z","rank":5,"volume":4},{"captured_at":"2026-09-27T23:31:42.593659Z","rank":5,"volume":4},{"captured_at":"2026-09-28T00:53:42.698685Z","rank":5,"volume":4},{"captured_at":"2026-09-28T02:15:44.289799Z","rank":5,"volume":4},{"captured_at":"2026-09-28T03:37:44.040578Z","rank":5,"volume":4},{"captured_at":"2026-09-28T04:59:42.749119Z","rank":6,"volume":4},{"captured_at":"2026-09-28T06:21:42.657794Z","rank":5,"volume":4},{"captured_at":"2026-09-28T07:43:42.909531Z","rank":6,"volume":4}],"posts":[{"platform":"mastodon","url":"https://mastodon.social/@paulmuenzner/117344659118284497","author":"paulmuenzner","title":null,"snippet":"Singapore changed its rule for electricity imports: 2024: 75% load factor in every quarter 2025: 60% over the year Per 1,000 MW import capacity: 5.256 instead of 6.570 TWh a year, 20% less. Does it apply to earlier approvals? Not public. Analysis below 👇 # Singapore # Energy","posted_at":"2026-09-27T19:30:01.098000Z","likes":4}],"elsewhere":[],"window":"7d"}}